AI News HubLIVE
站内改写1 分钟阅读

待翻译:‘Never seen this level of objection’: Scotland pushes back against datacentre boom

AI 服务暂时不可用,以下为来源摘要,待恢复后补全翻译:Holyrood ‘inching towards moratorium’ amid concerns over massive proposed developments in Auchtertool and beyond In a village 21 miles north of Edinburgh, a real estate consultancy plans to build a datacentre larger than the village itself – 35 metres high, with an area larger than 100 football pitches. Billed as the second-biggest datacentre in the world, the development in Auchertool, Fife, has attracted 1,600 objections. Continue reading...

来源The Guardian AI作者: Aisha Down Global technology reporter

AI 服务暂时不可用,以下为来源正文,待恢复后补全翻译。

Holyrood ‘inching towards moratorium’ amid concerns over massive proposed developments in Auchtertool and beyond In a village 21 miles north of Edinburgh, a real estate consultancy plans to build a datacentre larger than the village itself – 35 metres high, with an area larger than 100 football pitches. Billed as the second-biggest datacentre in the world, the development in Auchertool, Fife, has attracted 1,600 objections. Continue reading...